The screen surface was also installed in September 2002 and the system accommodated water soon after. These are located upstream of the old drum screen, and are the primary means of dealing with bedload and suspended load from the diversion. In September 2002, the jersey barriers and vortex tubes were installed. During the spring the secondary head level control gates were installed. In December 2001 and January 2002, the concrete work was completed and the head gates were mounted. Final engineering and design for the horizontal screen was completed during the winter of 2001. OBJECTIVE 4-Assist the Farmers Irrigation District (FID) in construction and installation of a new fish screen and bypass system on the mainstem Hood River (Farmers Canal). Project completion is expected in July 2003. However, due to a lengthy permitting process and NMFS consultation, this project was inadvertently delayed. During FY 02 the final engineering was completed on this project. This objective was revised and included in the FY 03 Statement of Work for Project No. ![]() Upon completion, this project will restore 2.5 miles of access for winter steelhead, coho salmon, and resident trout habitat. OBJECTIVE 3-Assist Middle Fork Irrigation District in developing an alternative irrigation water source on Evans Creek (Hutson pond and Evans Creek diversion), eliminating the need for irrigation diversion dams which happen to be partial fish barriers. This document was updated and revised to reflect changes to fish habitat and needs in the Hood River basin based upon other documents and actions taken in the basin. This document is utilized for many purposes including: drafting the Watershed Action Plan, ranking projects for funding, and prioritizing projects to target in the future. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). OBJECTIVE 2-Develop, coordinate, and implement the Hood River Fish more » Habitat Protection, Restoration, and Monitoring Plan. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 1-Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). The BFRF is valve house with an energy dissipation chamber for a 60” fixed cone valve capable of passing 1,300 cfs for meeting the recreational flow requirements of the license. The South Fork Powerhouse is a single generating unit with a capacity of 2.98 kVA. ![]() This new penstock bifurcates at more » the Adit #3 portal with one leg going to the BFRF and the other to the new powerhouse. The South Fork Powerhouse routes flows back to the South Fork of the American River via a new penstock that is tied into the White Rock Tunnel at Adit #3. The terms of the new license allow the Slab Creek Powerhouse to utilize the original required dam releases, while the new South Fork Powerhouse will use the new instream flow requirements above the original license requirement. 2101-084) requires significantly more instream flows immediately below the dam for aquatic preservation and recreational flows over the original license. A small 450 kW powerhouse located at Slab Creek Dam utilizes the original license in-stream flow requirement. Water is conveyed from Slab Creek Reservoir through a 4.9 mile power tunnel to the 224 MW White Rock Powerhouse which discharges into Chili Bar Reservoir. Slab Creek Dam impounds 16,600 acre-feet of storage and has a normal full pool elevation of 1850ft. The Sacramento Municipal Utility District (SMUD) has constructed a new powerhouse and Boating Flow Release Facility (BFRF) ¼ mile downstream of the existing Slab Creek Dam with the assistance of grant funding from the Department of Energy in the amount of $1.5 million.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |